Applies to: E4

Commissioning

The installation steps to operation are:

Step 1: Starting the machine

BEWARE

Short-circuit hazard when the machine is too cold

If the machine is transported from a cold environment into a warmer environment, a short circuit may occur caused by condensate.

  • Before switching on the machine after transportation, ensure the following:
  • The ambient air has the allowed temperature.
  • The machine has the same temperature as the ambient air. This will take at least 48 hours.
  • The machine is completely dry.
  1. Close the working chamber door.
  2. Switch on the machine at the main power switch.

    • The working chamber lighting is on. The machine references.

 

 

Step 2: Setting up a software connection to the machine

(missing or bad snippet)

Step 3: Warming up the spindle

Step 4: (Optional) Set up chairside workflow

Valid only for dentalcam 8

Step 5: Filling the cooling liquid

This is necessary for wet machining.

Filling the cooling liquid

What's next?

If you want to create a job in dentalcam:

Basic workflow

If you want to mount blanks:

Mounting and removing blanks